Publish two technical posts from your deliverables
CPU · your Macdesign420 minrequiredGoal · Publish two blog posts, each built from a Phase 4 to 6 lesson deliverable, with reproducible numbers and at least one plot.
- 1Choose two deliverables with measured results (for example the Triton matmul benchmark and the vLLM request trace, or the paged attention kernel and the capacity validation).
- 2Outline each post with the narrative arc; write the one-sentence result first.
- 3Rerun the experiment or trace on the pinned version and record hardware, software versions and commands.
- 4Write the body, keeping every claim attached to a number or a code link; add the plot and a reproduction section.
- 5Ask one person to read each draft and fix every point they found confusing.
- 6Publish on your own site, GitHub Pages or a platform you control, and share the link in at least one relevant community.
- 7Turn the customer workload capstone from p6-production-architecture into a concise case study: customer constraint, baseline, experiment, result, trade-off, production recommendation and what changed after feedback.
- 8Give a ten-minute executive version to someone outside the project using no unexplained inference jargon; ask them to state the decision and top risk back to you, then revise until both are correct.
- Deliverable
- Two public URLs and the markdown sources in your portfolio repository.
- Check
- Each post has a reproduction section with versions and commands, at least one plot, and a reader unfamiliar with the project can state the result after reading the first paragraph.